Showing posts with label SAP PP Objective type Questions and Answers. Show all posts
Showing posts with label SAP PP Objective type Questions and Answers. Show all posts

Saturday, 5 September 2015

SAP PP Objective type Questions and Answers

11. A plant can be a physical plant or a logical section of a plant
a) Yes
b) No.
Ans: a

12. Storage locations are areas where materials are stored within a plant
a) Yes
b) No.
Ans: a

13. A purchasing organization can buy for a number of plants
a) Yes
b) No.
Ans: a

14. A purchasing group is a sub-set of a purchasing organization
a) Yes
b) No.
Ans: a

15.  Strategy Group is relevant for Material Requirement Planning
a) True
b) False
Ans: a

16. MRP can be caried out at :
a) Plant Level
b) All Routings
c) Single item – single level
d) Single item – multiple level
Ans: a, c, d

17. In Material Requirement Planning
a) Material availability is ensured
b) If shortage exists the corresponding elements are planned
c) Stock transfers are also possible
d) The availability of the components is ensured via dependent requirements
Ans: d

18. With Make – to Stock strategy 10
a) MRP run considers only Sales Orders
b) MRP run considers only PIR
c) MRP run considers both Sales Order & PIR
d) Sales Order can consume PIR
Ans: b

19. The Individual / Collective indicator in the material Master determines
a) Whether a component is procured for a special customer requirement in the individual segment
b) Requirement quantities of dependent materials are grouped together during MRP run
c) The Material Requirement Planning
d) The Special Procurement.
Ans: c

20. ATP – Available to Promise (Availability check)
a) System checks if all issues are covered by existing receipts
b) Checks if receipts’ quantity still available to cover newly received issues
Ans: a

More Questions & Answers:-
Page1 Page2 Page3 Page4 Page5

Top 50 SAP PP Objective type Questions and Answers

1. What is the T Code for changing planned order?
A. MD11
B. MD12
C. MD13
D. MD14
Ans: B

2. Production Planning Module is integrated with which of the following modules?
A. Material Management
B. Controlling
C. Quality Management
D. Sales and Distribution
E. All the above
F. None of the above
Ans: E

3. Which of the following are valid BOM categories?
A. Inspection BOM
B. Material BOM
C. Equipment BOM
D. Costing BOM
E. All the above
F. Only b,c and d
Ans: F

4. Movement Type for Goods Receipt in to Ware House
A. 261
B. 301
C. 101
D. 102
Ans: C

5. What is the T code for “Display production lot”?
A. MDL3
B. MDL4
C. MEL5
D. MEL3
Ans: A

6. What is the T Code for displaying planning file entry?
A. MD21
B. MD12
C. MD11
D. MD10
Ans: A

7. What is the use of BOM?
A. MRP
B. Costing
C. Inspection data
D. Sales and Distribution
E. None of the above
F. All the above
Ans: F

8. Routing contains information about which of the following?
A. Material Components
B. Operations
C. Capacity for Work Centers
D. Inspection Characteristics
E. All the above
F. a,b and c
Ans: F

9. A Material BOM is created without plant. What would you call it?
A. Reference BOM
B. Master BOM
C. Group BOM
D. Master group
E. None of the above
Ans: C

10. Where is work center used?
A. Routing
B. BOM
C. Material Master
D. Inspection Plans
E. All the above
F. a and d
Ans: F

More Questions & Answers:-
Page1 Page2 Page3 Page4 Page5