Saturday 5 September 2015

SAP PP Multiple Choice Questions And Answers

21.  Availability Check PIRs System does not check against PIRs
a) True  
b) False
Ans: b

22. No ATP quantities, receipts or stocks are included
a) True  
b) False
Ans: b

23. Determines if sufficient PIRs are planned to cover a SO
a) True  
b) False
Ans: b

24.  Consumption based planning is usually used for following materials
a) All A & B Class Materials
b) Materials with smooth consumption pattern.
Ans: b

25. For Planning at Phantom Assembly Level planned orders are created for Phantom assembly
a) True  
b) False
Ans: b

26. Stock Requirements List gives ___________________ situation of stock requirement for the material
a) Static  :  of the last MRP Run
b) Dynamic  :  Existing at current situation
Ans: b

27.  Is Sales order A Qty. 15 PC and Sales order B Qty. 25 PC are booked on same date and stock is 0 PC
a) Separate Planned Order for each Sales Order shall be created if individual indicator is set
b) Only one planned order is created if individual indicator is set
c) Separate Planned Order for each Sales Order shall be created if Collective  indicator is set
d) Only one planned order is created if Collective indicator is set
Ans: a, d

28.  Planning can create the following after MRP run
a) Planned Orders
b) Production Orders
c) Purchase Orders
d) Schedule Lines
Ans: a, b

29. NETCH is
a) Used in Demand Management
b) Key to run MRP for Total horizon
c) Key to run MRP for Total Planning horizon
d) Not related to MRP
Ans: c

30.        What is the difference between a operation-related and order-related confirmation?
a)        Order confirmation is a confirmation of the entire order at order header level and an Operation confirmation allows you to confirm an order step by step.
b)        Order confirmation is a confirmation of the entire order before sending to production and operation confirmation is a step by step confirmation of production order
c)        Order confirmation is partial confirmation of the order and operation confirmation is automatic final confirmation of the order
d)        Order confirmation requires a goods receipt, operation confirmation does not require a goods receipt
Answer: a

More Questions & Answers:-